Platform features

Three roles. One platform. Every detail accounted for.

Modules built specifically for the quantity surveyor, the project manager, and the contracts manager — in genuine construction language.

For the Quantity Surveyor (QS)

Cross-reference, compare, certify. Never under- or over-claim.

🏷️

Tender Analysis

Compare extracted tender prices, flag gaps, and leave the award decision with you.

Tender comparison is one of the most time-consuming tasks in the employer's QS workload. Multiple submissions, different rates, and missing figures all need to be laid out so a human can make a defensible award decision.

Taskabeez compares recorded tender sums and line items on Professional: it ranks by extracted price only, flags rates more than 20% below the cross-tender average, and labels unmatched or missing figures as “Not stated in the uploaded documents”. It does not invent commentary, best-value scores, or a recommended tenderer.

The output is a comparison matrix for you to review. Award language stays with the QS — confirm extracted figures before any recommendation to the employer or board.

For example

For example: Three tenders are received for a façade package. Tenderer B has the lowest extracted sum but a glazing-sealant line is not stated in the uploaded documents. Taskabeez ranks B lowest on extracted price, labels the missing line, and leaves the award decision with you.

Tender Comparison — Façade Package
IDDescriptionStatus
Tenderer A£2,847,000CompliantQUALIFIED
Tenderer B£2,614,000Partial excl.QUERY
Tenderer C£2,791,000CompliantSTATED
💳

QS Intelligence

Payment applications cross-referenced with programme progress and your BOQ.

Interim payment applications are the lifeblood of a contractor's cash flow. Preparing them correctly — cross-referencing programme progress, applying rates from the BOQ (Bill of Quantities), incorporating approved variations, and deducting retentions — is a significant monthly effort.

Build interim payment applications line by line from your BOQ with quantities measured this period, cumulative amounts, and automatic section totals. Approved variations can be included at agreed values. Retentions and other deductions follow your contract settings.

With the Virtual QS Office add-on, Taskabeez can draft a programme-weighted payment application estimate from live programme progress and approved variations for you to review before submit. It does not replace measured BOQ quantities or auto-file a dispute when the certified amount differs — you remain in control of measurement and follow-up.

For example

For example: IPC (Interim Payment Certificate) #7 is due on 14 May. With Virtual QS Office active, Taskabeez drafts a payment application estimate from programme progress on Block A structure and demolition, plus approved VO-028 through VO-032, and opens it for your review. You adjust measured quantities, approve, and submit. If the certified amount comes back lower, you decide whether to raise a shortfall follow-up — Taskabeez does not auto-open a dispute.

IPC #7 — Summary
IDDescriptionStatus
Demolition100% complete£84,200INCLUDED
Structure L1–L468% complete£183,600INCLUDED
Variations VO-028–0325 approved VOs£44,650INCLUDED
📒

BOQ & Final Account Control

Every variation tracked from instruction to final certificate.

Final account preparation is where commercial work either pays off or unravels. Variations agreed in principle but never priced, claims raised but never resolved, retentions overdue for release — all of it has to be assembled into a defensible final account with the contemporaneous evidence to back it.

For tendering, Taskabeez provides BOQ tools with manual entry, document extraction, priced exports, and a curated library of sixteen templates (including office fit-out, villa, apartment block, retail, warehouse, school, healthcare, hotel, data centre, road, rail, mezzanine, mixed-use shell, bridge repair, solar, and industrial plant). Import brings sectioned line items with blank rates for you to price. Experimental AI generation is available on Professional if no template fits; the library is the primary path and is available on Starter.

Taskabeez tracks every VO, CVI (Confirmation of Verbal Instruction), EOT (Extension of Time claim), and dayworks ticket from the moment it is raised, with the contractual entitlement, the agreed value, and the supporting evidence linked together. When you reach final account, the assembly is already done — you only have to certify it.

Internal cost rates, markup percentages and margin data stay strictly private. Published documents show only description, unit, quantity, agreed rate and total amount.

The Final Account tab provides a complete final account workspace where QS professionals can build the final account statement, track agreed variations, and export a client-ready final account PDF.

For example

For example: At final account, you have 31 variations spread across 7 months. Taskabeez assembles the variation schedule, links each to its CVI / instruction email / site diary entry, calculates the agreed total, and outputs a branded Final Account Statement ready for the employer's QS.

Final Account — Variations
IDDescriptionStatus
VO-028Demolition scope add£18,400INCLUDED
VO-029Waterproofing membrane£12,600INCLUDED
VO-031Column grid E3 detail£8,900QUERY
For the Project Manager

Programme integrity from baseline to handover. Catch the drift before it costs you weeks.

📊

Programme Management

Gantt chart with critical path, delay detection, and claim linkage.

Your programme is not just a schedule — it is the foundation of your delay claims. Every day of critical delay needs to be documented, causally linked to a delay event, and supported by a contemporaneous programme record. Without this, a delay claim becomes an argument instead of a proof.

Taskabeez maintains a live Gantt chart for each project, with critical path analysis updated as activities are completed or slipped. When a delay event is detected — whether by the AI reading connected email (requires email account connection on Professional tier or above) or by you recording it manually — it identifies delay events and guides you through EOT (Extension of Time claim) notice preparation with programme impact analysis.

Start a programme from a curated template library — 28 programmes covering fit-out, new-build, refurbishment, infrastructure, healthcare, rail, marine, and energy, from 12-week packages through to an 18-month hospital or high-rise shell. Import brings tasks, predecessors, and working-week options. Experimental AI generation is available if no template fits; the library is the primary path.

At the end of the project, you have a complete contemporaneous programme record that supports every extension of time claim you have made. This is what strengthens your position in disputes — not a retrospective analysis prepared after the fact.

The Handover module guides contractors through the complete handover journey from Notice to Hand Over through Taking Over Certificate to Performance Certificate with automatic DLP (Defects Liability Period) tracking and retention release reminders.

For example

For example: An instruction is issued on 8 May expanding the demolition scope on Level 3. Taskabeez identifies the programme impact, guides you through EOT notice preparation for an 8-day critical delay, and helps you open an EOT claim entry. You link the event to the structural works activity on the Gantt chart when you record it.

Programme — Block A (Week 19)
IDDescriptionStatus
StructureL4 slab pour8 May – 22 MayGREEN
FaçadeCurtain wall install15 May – 20 JunDELAY
MEPFirst fix — L3 & L429 May – 14 JunAMBER
🛠️

Procurement & Submittals Control

Long-lead items, approval cycles, and call-offs linked to the programme.

The fastest way to lose a programme is a missed procurement deadline. One late submittal cascades into four delayed successor tasks. By the time the delay is visible on the live programme, the claim window may already have closed.

Taskabeez tracks every procurement item — long-lead equipment, specialist subcontract packages, material submittals — against the activity it feeds in the programme. When an item is at risk, the affected activities are flagged and the programme impact is calculated before the delay shows up on the Gantt.

Submittals follow their own approval cycle, with revision tracking, comment loops, and integration with RFIs (Request for Information) so that no instruction sits unresolved past its review-by-date.

For example

For example: A specialist MEP package has a 16-week lead time. The procurement deadline slips by 5 working days while the procurement team chases a clarification. Taskabeez flags this against MEP first fix on the Gantt, calculates a 5-day knock-on delay on the critical path, and surfaces an early warning so the contractor can issue the appropriate notice.

Procurement Watchlist
IDDescriptionStatus
PROC-014Specialist MEP package16 wk leadDELAY
PROC-015Curtain wall — submittal R3ApprovalAMBER
PROC-016Lift package call-offReleasedINCLUDED
📅

Baseline & Progress Control

Live progress against baseline, with delay records built as you go.

A delay claim is only as strong as its contemporaneous programme record. Without a saved baseline and a live record of what actually happened week by week, an extension of time claim becomes an argument instead of a proof.

Taskabeez lets you save a baseline programme at award. From that point on, every activity slip is recorded automatically against the baseline, with a date-stamped record of when the variance was first observed.

When a delay event is detected — whether from an email, an RFI response, or your own entry — it is linked to the affected activities and the delay record is preserved for use in any future EOT claim.

For example

For example: The baseline shows L4 slab pour starting on 8 May. The actual pour starts on 15 May because of a late RFI response. Taskabeez records the variance against baseline, links it to RFI-024 (responded 6 days late), and prepares an EOT claim entry referencing the contemporaneous record.

Baseline vs Actual — Week 19
IDDescriptionStatus
L4 slab pourBaseline 8 MayActual 15 MayDELAY
MEP first fixBaseline 29 MayOn trackINCLUDED
Façade installBaseline 15 MayForecast slipAMBER
For the Contracts Manager

Notices, claims, and correspondence — read, drafted, and surfaced for your approval.

🧠

AI-powered contractual intelligence

Built into every module so you never miss a contractual deadline.

AI-powered email analysis (requires email account connection on Professional tier or above). The system analyses emails for contractual events when your email account is connected. When an email cites an RFI (Request for Information) or VO (Variation Order) code, Taskabeez can link it to the matching register record and surface that correspondence on the record and in the Consultant Log. A revised drawing issued late, an instruction that extends the programme, a payment certificate that falls short — each of these is a potential claim event, and each has a countdown clock attached to it.

The system cross-references each event against your specific contract — FIDIC 1999, FIDIC 2017, NEC4, JCT, or AIA — and immediately calculates the notice period that applies. It drafts notice language and alerts you with the days remaining before the deadline expires. Any new record is created only after you review and approve an AI recommendation.

This is not a keyword search. Taskabeez understands construction communication the way a contracts manager does — it reads context, infers causation, and flags the events that matter before you even knew they happened.

For example

For example: On a JCT design-and-build hospital extension, an email confirms revised structural information will arrive late, affecting the frame programme. Taskabeez suggests an extension-of-time entry with the correct JCT notice period for your approval. On a FIDIC tower, the same event would be tracked under the relevant delay and notice clauses — you are not left relying on memory.

Contractual deadline tracker
IDDescriptionStatus
CE-019Late design info — frameJCT 2.29NOTICE DUE
CE-018NEC4 early warning — steelNEC cl.15OPEN
CE-017AIA change directiveAIA 9.3CLOSED
🤖

Consultant Log & Agent Alerts

13 agents scan your projects. You review and approve every alert.

On Professional tier and above, 13 specialist agents run across your active projects. They scan every module — RFIs, payments, variations, MARs (Material Approval Request), snagging, handover, and more — and create prioritised alerts in your Consultant Log when they find commercial risks.

Every alert includes a priority rating, a professional explanation of the risk, and draft response text ready for your review. Open the Consultant Log from any project sidebar, or run a full scan manually whenever you want a fresh pass.

Nothing is sent or executed automatically. Agents suggest. You review each alert and click Approve or Reject to record your decision. Only approved actions update your live registers.

Morning briefings are generated by the agent system and shown as a banner on the project overview page and in the Consultant Log. They summarise pending critical and high alerts. Available on Professional tier and above.

Consultant Retainer adds the scheduled overnight loop on enrolled projects and the Portfolio Briefing — one daily / on-login digest across those projects (critical deadlines, overnight findings, pending approvals, last/next run). On enrolled projects it can also raise opt-in recurring contractual deadline prep alerts and raise one synthesized critical-delay finding — schedule impact, contractual/notice considerations, and honest cost exposure (real figures when data allows, clearly flagged when it doesn't) — with a recovery letter attached, for critical Gantt slips with a named resource. Professional keeps agents, Log, and manual Full Scan; the overnight loop, Portfolio Briefing, recurring prep alerts, and Critical delay synthesis + recovery letter are Retainer-only.

For example

For example: A pay-less-notice window is closing in four days. The Payment Agent flags it as High priority in your Consultant Log with a drafted letter referencing the correct clause. You review it in the morning, make one edit, and approve. The decision is logged — nothing was sent until you chose to act.

Consultant Log — Agent Alerts
IDDescriptionStatus
CRITICALPay less notice — IPC #74 daysREQUIRED
HIGHRFI-047 overdue — time bar2 daysREQUIRED
MEDIUMVO account stale — 21 daysReviewPENDING
📋

Contract Aware

The correct contract clause applied automatically every time.

Every construction contract has different notice periods, different claim mechanisms, and different terminology. FIDIC Sub-Clause 20.1 gives you 28 days. NEC4 Early Warning requirements are triggered differently. JCT extensions of time follow their own process. Getting these wrong does not just weaken your position — it can extinguish your right entirely.

When you set up a project in Taskabeez, you select your contract type. From that point on, every claim entry, every notice, and every deadline is governed by the correct clauses for that contract. The system knows which Sub-Clause applies, what language the notice must contain, and who it must be addressed to.

When contract amendments apply, you can upload your contract and Taskabeez can analyse it and surface relevant particular conditions as drafting and review context. Uploaded Z-clauses and special conditions do not automatically rewrite notice deadlines or override the standard-form timelines in the product — verify those against your executed contract. Contracts are not generic — and neither is Taskabeez.

For example

For example: Your project uses NEC4 ECC with Z-clauses that tighten early-warning practice. You upload the contract. Taskabeez can analyse those Z-clauses and cite them when drafting early warnings and related notices for your review. Notice and compensation-event timelines in Taskabeez still follow the selected contract type (NEC4 CE notification remains the 8-week / Clause 61.3 window unless you set them manually) — uploaded Z-clauses are not applied as an automatic deadline override.

Contract Configuration
IDDescriptionStatus
FIDICRed Book 1999Sub-cl. 20.1ACTIVE
NEC4ECC Option CEarly warningACTIVE
JCTSBC 2016EOT noticeACTIVE
Agent system

Proactive Contract Intelligence

Most construction software tells you what happened. Taskabeez tells you what is about to happen and what to do about it.

13 specialist agents run continuously across your projects:

Notice Agent

Monitors RFIs, RFAs (Request for Approval), drawing revisions, and minutes of meeting for contractual time bars and missed response deadlines.

Payment Agent

Tracks certification deadlines, identifies undercertification, monitors retention release dates, and flags when pay less notice windows are closing.

Variation Agent

Monitors the CVI-to-VO pipeline, flags stale variation accounts, and catches drawing revisions that contain unrecognised scope changes.

EOT Agent

Assesses programme impact when RFIs go overdue, MAR approvals are delayed, or drawing revisions require rework on the critical path.

MAR Agent

Monitors material approval deadlines, flags substitution instructions that need a CVI, and triggers procurement alerts for approved long lead items.

PMI Agent

Monitors PMI (Project Manager's Instruction) registers, NEC4 8-week compensation event deadlines, flags ambiguous instructions, and identifies verbal instructions that need written confirmation.

Snagging Agent

Manages DLP (Defects Liability Period) defect clearance, flags employer-caused items for commercial assessment, and alerts when high-priority items are open too long.

Final Account Agent

Monitors the variation account for staleness, identifies unclaimed prolongation costs on agreed EOTs, and tracks final statement submission deadlines.

H&S, Handover, Procurement, Progress Report, and Document Intelligence agents complete the coverage.

Every alert appears in your Consultant Log with:

  • • Priority rating: Critical, High, Medium, or Low
  • • Full professional explanation of the commercial risk
  • • Draft response text ready for your review
  • • One-click approve or reject

Nothing is ever sent automatically. Every action requires your approval.

Enterprise platform plan

Everything in Professional, plus up to five people per project (including you) with role-based access, 5M AI tokens per month (250k/day soft cap), and priority email support with onboarding guidance.

Enterprise adds seats and support on top of the Professional AI suite. Single sign-on is not included in this plan.

Ready to protect your claims?

Free plan available — no card needed.

Get Started Free →