Your AI Construction Contracts Manager

16 specialist modules. Veteran-level AI across FIDIC, NEC4, JCT, and AIA. 13 intelligent agents watch your registers, flag what matters, and draft responses for your review — you approve everything before anything goes out.

Free plan available · No card needed · Cancel anytime

AI Contract Intelligence

⚠ CRITICAL ALERT

NEC4 early warning — procurement delay on the MEP package is affecting the critical path on a commercial office tower. Respond within 5 days to preserve your programme position.

✎ NEW CVI DETECTED

Verbal instruction from Site Engineer on 08 May — demolition scope expanded. CVI (Confirmation of Verbal Instruction) drafted and ready for your review. Estimated variation value: £47,200.

✓ PAYMENT APPLICATION

IPC (Interim Payment Certificate) #7 compiled — £312,450 certified. Cross-referenced against programme progress and approved VO register.

Built by someone who's been there

Does this sound like your week?

The feeling that you're always one step behind and overwhelmed — chasing a reply that never comes, digging through your inbox to find who actually gave that instruction, rebuilding numbers at midnight because they're scattered across three spreadsheets. And still running the site, still answering the engineer, still keeping the client happy.

It's not that you're not good at this. It's that no one person was ever meant to hold it all.

Taskabeez was built by someone who lived that — on live projects, not from a software lab. Someone who knows that one missed instruction or deadline can cost more than any mistake on site.

If you are a Project Manager, Contracts Manager, Construction Manager, Quantity Surveyor, or anyone else in construction who knows this pressure — Taskabeez was built for you.

Everything in one place — registers, programme, payments, and contract-aware AI — with you in control every step of the way. So you can stop juggling and start focusing on what actually matters: getting the job done.

Sound familiar?

Three roles. Three quiet failures that cost contractors more than any single mistake on site.

For the Quantity Surveyor

The variation that got absorbed.

A small scope addition on a residential tower fit-out. You meant to raise a VO (Variation Order). The project moved on. By final account it is too late.

For the Project Manager

The programme that drifted without anyone noticing.

One delayed procurement item on a civil infrastructure package. Four successor tasks affected. By the time the slip appears on the programme you have lost weeks of notice time.

For the Contracts Manager

The email that changed everything.

A casual line in an email on an industrial warehouse under JCT. New scope. No formal instruction. No CVI. No claim. Money left on the table.

CVIs & RFIs

Guides you to document every instruction through the correct contractual module

Ensuring nothing is missed — every verbal instruction, email direction, and site communication is guided into the correct CVI or RFI workflow so the record exists before a dispute arises. The same platform holds your Variation Orders, EOT (Extension of Time) claims, Payments, Gantt programme, and Snagging registers — so instructions, time, money, and close-out stay connected, not scattered across spreadsheets.

FIDIC notices, NEC4 early warnings, JCT extensions of time, and AIA change processes — surfaced in your Consultant Log before notice periods slip.

Explore all features →

Simple, transparent pricing

Start free. Scale as you grow.

Free Clipboard available — no card needed

Free Clipboard

$0

Starter

$19/mo

Professional

$49/mo

Enterprise

$149/mo

Stop losing money to missed claims.